Data Center Economics

October 28, 2009 Leave a comment Go to comments

Companies are only building what they need. A weak economy and green IT initiatives mean that techies are increasingly going to be judged by their data center savings, says David Cappuccio, an analyst at Gartner. An efficient data center design can cut the footprint by 60 percent.

Tiers are being mixed and matched with one data center. Data centers have tiers of availability. Tier 1 is 99.6 percent uptime and Tier 4 is 99.995 percent with Tier 2 and Tier 3 in between. To build a Tier 1 10,000 square-foot facility the cost is $9.94 million. Tier 4 will run you $34.5 million, according to Gartner.

One of the more recent trends is to mix and match tiers within one facility. With this approach, you can segment applications based on the importance to the business.

Everyone has a box for mid-sized and large businesses. IBM, Rackable, Sun, Verari Systems and HP all have trailers (right) that can extend data centers and deploy in 12 to 14 weeks. Cappuccio noted that Microsoft has a large 200-and-more-container deployment at its Chicago data center. Microsoft is also experimenting with wind-powered containers. For mid-sized companies these containers could become an alternative to traditional data centers—slap these boxes on a slab and go.

Pod architecture. Cappuccio noted that previous data center design principles went like this: Build a facility for today, estimate what you’ll need in 20 years, and go. Today, it’s all about pods. With this approach you figure out how much space you need, say 15,000 square feet, and then build out for five to seven years. Then you add pods as you grow. Pods also allow for retrofitting so a data center complex can last 40 to 50 years.

Combine pod architectures with density zones. Cappuccio added that data centers should be designed by density zones. High-density applications (200 watts per square foot) represent 10 percent to 15 percent of a total data center usage. Medium-density apps (150 watts per square foot) account for another 20 percent. The rest is low-density (100 watts per square foot). If you mix and match densities you save money on the build-out. The density zone approach is likely to be used in the majority of new or retrofitted data centers by 2013. Double bonus if you take the pod architecture and use density zones.

The money chart:

Raised floors are passe. Anyone who has been in a traditional data center knows that raised floors, anywhere from 12 to 18 inches to 24 to 48 inches, are the norm. If you design a data center properly you can use a concrete slab for the build out. Building on a slab can be $20 per square foot cheaper than a raised floor.

And once you learn the data center principles all you have to do is evaluate all of these vendor data center visions dancing around. The field: Cisco, Oracle, HP, IBM and VMware. You can toss Dell, Microsoft, Amazon and Google into the mix too. The big takeaways from Gartner’s talk on the vendor data center vision are:

  • Don’t get locked into anything proprietary;
  • The tectonic plates between these vendors are still shifting;
  • Don’t let any one vendor creep to the point where it controls your budget. Data centers aren’t meant to be homogeneous.

That final point is very notable. Most data center players have adjacent products and if you’re not careful your entire enterprise could depend on one big name.

Advertisements
Categories: IT Infrastructure
  1. No comments yet.
  1. No trackbacks yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: